Severe Landslide Halts Train Services in Lumding-Badarpur Section, Multiple Routes Affected
In a troubling development for railway connectivity in Assam, a massive landslide has caused a serious Lumding-Badarpur train disruption, leaving numerous passengers stranded and train services either cancelled or diverted. The incident occurred in the early hours of Monday, severely affecting the hill section of the Lumding division under the Northeast Frontier Railway (NFR).
This disruption comes amidst relentless rainfall in the region, which has led to soil loosening, posing ongoing challenges to safe railway operations. Authorities have since taken immediate action to assess the damage and initiate restoration work.
Extent of the Lumding-Badarpur Train Disruption
The landslide occurred near the New Harangajao area, leading to heavy debris falling onto the tracks. Due to the topographical challenges and inaccessibility of the hilly terrain, it has been difficult for the engineering teams to reach the site and begin clearance work quickly.
Train services between Lumding and Badarpur—an essential route connecting the Barak Valley region with the rest of Assam—have been halted as a precautionary measure.
According to railway officials, at least 10 trains have been cancelled, and several others rerouted through alternative paths to ensure the safety of passengers.
Railways Respond Swiftly to Lumding-Badarpur Train Disruption
The Northeast Frontier Railway issued an official statement acknowledging the landslide and subsequent Lumding-Badarpur train disruption. “Passenger safety is our top priority. Restoration work is ongoing with utmost urgency,” a senior NFR official said.
Rescue and repair teams have been deployed to the affected areas, and heavy machinery has been mobilized to clear the debris. However, continuous rainfall has made the task increasingly challenging.
Train Services Affected Due to Lumding-Badarpur Train Disruption
Among the major trains affected by the disruption are:
- Train No. 15615 Guwahati-Silchar Express – Cancelled
- Train No. 15616 Silchar-Guwahati Express – Cancelled
- Train No. 12503 Agartala-Bangalore Express – Diverted
- Train No. 12504 Bangalore-Agartala Express – Diverted
- Train No. 15663 Agartala-Silchar Express – Cancelled
Passengers have been advised to check real-time updates on the status of their respective trains through the Indian Railways website and NTES mobile app. Many travelers have expressed frustration over the disruption, especially as the hill route remains one of the few rail links connecting southern Assam and parts of Tripura to the rest of India.
Challenges in the Restoration of Lumding-Badarpur Rail Line
The Lumding-Badarpur section passes through a geologically sensitive hilly terrain, making it vulnerable to landslides, especially during the monsoon season. In the past, similar disruptions have taken weeks to resolve due to the difficulty of deploying heavy equipment in such regions.
Current challenges include:
- Continuous rainfall hampering visibility and machinery use
- Risk of secondary landslides during repair work
- Remote location making access and logistics slow
Despite this, the NFR is hopeful that partial restoration can be achieved within a few days if weather conditions improve.
Local Economy Impacted by Lumding-Badarpur Train Disruption
The Lumding-Badarpur train disruption is also expected to have a negative impact on the local economy, especially in Barak Valley, which relies heavily on this rail link for the movement of goods and essential supplies.
Traders and businesses have raised concerns about rising freight costs and delays in the delivery of agricultural produce, construction materials, and other vital goods.
Public Reaction and Safety Precautions
Local residents and regular train commuters have voiced both disappointment and concern. “We depend on this line for everything—from travel to trade. It feels like we’re cut off again,” said a commuter in Silchar.
Railway officials have assured the public that no casualties were reported and that emergency protocols were immediately activated to ensure passenger safety.
Passengers stuck mid-route were either transported back to originating stations or given the option to reroute via alternative lines.
Railways to Strengthen Infrastructure Post-Lumding-Badarpur Train Disruption
This recent Lumding-Badarpur train disruption has prompted discussions on the need for more robust infrastructure, particularly in vulnerable hill zones. Experts are calling for the implementation of better drainage systems, slope stabilizations, and early-warning landslide detection mechanisms.
Railway authorities have hinted at reviewing their current operational policies and investing in preventive maintenance to avoid similar incidents in the future.
When Will Services Resume in Lumding-Badarpur Section?
While there is no official timeline yet, officials hope that services may resume partially by the end of the week if weather conditions become favorable. The railways have set up a 24/7 war room to monitor the situation, and progress is being reviewed on an hourly basis.
Travelers planning to use this section are strongly encouraged to reconfirm train schedules before departing and stay updated through railway helpline numbers.
Conclusion
The Lumding-Badarpur train disruption has underscored the vulnerability of critical railway infrastructure in northeastern India. While the immediate priority remains clearing the debris and restoring normalcy, the incident has raised deeper questions about long-term resilience and preparedness.
Efforts are underway, and railway authorities have promised to expedite repair work and implement permanent preventive measures in the future.
Discover more from RastriyaSamachar24x7
Subscribe to get the latest posts sent to your email.